Comprehensive structural remediation for residential property

The Challenge: Extensive structural cracking from foundation settlement and reactive soil movement threatened this occupied family home. Investigation revealed 40mm differential settlement affecting walls, slabs, and columns. Traditional underpinning would cost $180,000 and require 3-month family evacuation.
Our Solution: We implemented a three-phase strategy: hydraulic pier installation correcting 40mm settlement, epoxy injection for slab cracks, carbon fibre mesh for wall repairs, and structural grout for column stabilization. All work was phased room-by-room over 2 years, allowing continuous occupancy.
Results: The remediation stabilized the property with zero settlement in 12 months post-completion. Foundation leveling restored the building to within 2mm of design tolerance. The family avoided $60,000+ in temporary accommodation costs by remaining in residence throughout. Property valuation increased 15% following structural certification.

This Structural Remediation project by TRD Remedial in Schofields, NSW demonstrates our expertise in delivering professional building remediation solutions across Sydney and Greater NSW. Completed within 2 years (phased 2023-2025).

Structural Remediation - 54 Advanced Street Schofields
June 23, 2025Structural RemediationSchofields, NSW2 years (phased 2023-2025)

Structural Remediation - 54 Advanced Street Schofields

Comprehensive structural remediation for residential property

Back to Projects

The Challenge

Extensive structural cracking from foundation settlement and reactive soil movement threatened this occupied family home. Investigation revealed 40mm differential settlement affecting walls, slabs, and columns. Traditional underpinning would cost $180,000 and require 3-month family evacuation.

Our Solution

We implemented a three-phase strategy: hydraulic pier installation correcting 40mm settlement, epoxy injection for slab cracks, carbon fibre mesh for wall repairs, and structural grout for column stabilization. All work was phased room-by-room over 2 years, allowing continuous occupancy.

Results

The remediation stabilized the property with zero settlement in 12 months post-completion. Foundation leveling restored the building to within 2mm of design tolerance. The family avoided $60,000+ in temporary accommodation costs by remaining in residence throughout. Property valuation increased 15% following structural certification.

2yr

Phased Project Timeline

100%

Structural Integrity Restored

0

Occupant Disruptions