Structural Alterations & Multi-ServiceWentworth Point, NSW

Expert structural reconfiguration of an abandoned development — 40 columns removed, 5,000 linear metres of cutting, 2,000 core holes in five weeks

The Challenge: When Masscon acquired the existing One The Waterfront development — a partially completed complex previously abandoned by another developer — they inherited a structural challenge of significant scale. TRD Remedial was tasked with column removal, large slab penetrations for new stair cores and lift shafts, stormwater relining, and structural reinforcement.
Our Solution: TRD Remedial delivered an exceptional scope: 2,000 core holes drilled for shoring, 5,000 linear metres of concrete cutting through four suspended basement slabs and one slab-on-ground. 40 columns were removed with full propping and temporary works. Full stormwater pipe relining was completed.
Results: Despite the enormous scope, TRD Remedial completed the entire project in just five weeks, with no incidents, no delays, and no disruption to neighbouring occupied buildings. One The Waterfront stands as a testament to what is possible when expert planning and structural precision come together.

This Structural Alterations & Multi-Service project by TRD Remedial in Wentworth Point, NSW demonstrates our expertise in delivering professional building remediation solutions across Sydney and Greater NSW. Completed within 5 Weeks.

One The Waterfront — Structural Alterations & Multi-Service Works
2025Structural Alterations & Multi-ServiceWentworth Point, NSW5 Weeks

One The Waterfront — Structural Alterations & Multi-Service Works

Expert structural reconfiguration of an abandoned development — 40 columns removed, 5,000 linear metres of cutting, 2,000 core holes in five weeks

Back to Projects

The Challenge

When Masscon acquired the existing One The Waterfront development — a partially completed complex previously abandoned by another developer — they inherited a structural challenge of significant scale. TRD Remedial was tasked with column removal, large slab penetrations for new stair cores and lift shafts, stormwater relining, and structural reinforcement.

Our Solution

TRD Remedial delivered an exceptional scope: 2,000 core holes drilled for shoring, 5,000 linear metres of concrete cutting through four suspended basement slabs and one slab-on-ground. 40 columns were removed with full propping and temporary works. Full stormwater pipe relining was completed.

Results

Despite the enormous scope, TRD Remedial completed the entire project in just five weeks, with no incidents, no delays, and no disruption to neighbouring occupied buildings. One The Waterfront stands as a testament to what is possible when expert planning and structural precision come together.

2,000

Core Holes Drilled

5,000

Linear Metres Cut

40

Columns Removed